Skip to content
AVID GroupAVID Group
  • Home
  • About
  • Services
    • Electrical installation and maintenance works
    • High voltage switching & protection relay testing
    • Load Bank Testing
    • Thermography
  • Products
    • MV Switchgear
    • LV Switchboards and MCC
    • Power Generation
    • Kiosk Substation
    • Transportable Switch-Room
    • Hydrogen Fuel Cell
  • Projects
  • AVID News
  • Contact
Mining

Switch-room installation

VSD installation
low voltage installed in switch0-room
switch-room preparing for transport
Kwinana outdoor MCC
West Africa gold mine 11kV substation
Diesel Trailers

Mining

CATERPILLAR 3512

Mining

GOLD MINE SWITCHROOMS

Mining

MINE SWITCHBOARD AND ROOM FITOUT

Mining

NOVA NICKEL SWITCHBOARD

Mining

ENCLOSED STANDBY GENERATORS

Mining

Power station – motor control center

Mining

6.6kV substation upgrade

Mining

Kwinana outdoor MCC

Mining

West Africa gold mine 11kV substation

Mining

Industrial site at Kwinana (switch-room & 6.6kV switchgear installation)

Mining

Lithium mine in the south west

Mining

Barring Furnace Panel

Mining

Underground low voltage project

Mining

First Quantum Nickel mine switchroom and electrical package

Mining

Alcoa Low voltage Motor control center X-Energy

Mining

Head Office

Unit 3, 32 Harrison Rd
Forrestfield  WA  6058

Postal Address

PO Box 259
Forrestfield  WA  6058

Tel & Email

Ph: +61 8 9359 7100
Fax: +61 8 6210 1491

info@avidgroup.net

ISO 9001

Copyright © AVID EPG GROUP . EC 008553 . ABN 19 878 558 192
website: Splotch Studio - part of DTG
  • Home
  • About
  • Services
    • Electrical installation and maintenance works
    • High voltage switching & protection relay testing
    • Load Bank Testing
    • Thermography
  • Products
    • MV Switchgear
    • LV Switchboards and MCC
    • Power Generation
    • Kiosk Substation
    • Transportable Switch-Room
    • Hydrogen Fuel Cell
  • Projects
  • AVID News
  • Contact